Find or Sell Motorcycles & Scooters in USA

2006 Suzuki Boulevard on 2040-motos

US $
YearYear:0 MileageMileage:15
Location:

Deland, Florida

Deland, FL
QR code
2006 Suzuki Boulevard, US $, image 1

Suzuki Other description

2006 Boulevard C50 V-twin black metallic, tons of chrome only 15,208 mis---- for more details and access to pics, click on the POSTED link below "Autos Near Buy".....

Moto blog

2015 Suzuki GW250F Revealed for China

Mon, 18 Aug 2014

Suzuki’s Chinese partner Haojue has revealed a new fully-faired variant on the GW250. Revealed in Shanghai, the new GW250F follows the original naked GW250 (known in some markets as the Inazuma) and the semi-faired GW250S offered in Asia and Europe. The GW250S is powered by the same liquid-cooled 248cc Twin equipped on its siblings, claiming 24.1 hp at 8500 rpm and 16.2 ft-lb.

2022 Suzuki GSX-S1000GT First Look

Wed, 22 Sep 2021

Fast Facts Sport-touring version of the GSX-S1000 GSX-S1000GT+ model comes with 36L panniers First Suzuki with a 6.5´´ TFT display Claimed weight of 498 pounds without luggage Aerodynamics developed through wind-tunnel testing A sport-touring version of the new GSX-S1000 When Suzuki introduced its new GSX-S1000 earlier this year, we figured it was a matter of time before we saw a faired version to replace the GSX-S1000F. Well, Suzuki didn’t disappoint us, announcing a new 2022 GSX-S1000GT sport-tourer. The GT will be a welcome option for those looking for a sport-touring motorcycle that looks like a sportbike instead of the recent trend of pseudo-adventure bike styling.

Suzuki to Relocate R&D Facility to Lower Tsunami Risk Area

Thu, 07 Jul 2011

Suzuki is considering moving its motorcycle research facility from its current coastal location to its main factory in Hamamatsu, Japan, to decrease the risk of damage from future tsunamis. According to a report in the Nikkei business daily, Suzuki is acquiring more land in Hamamatsu to house the research center and other facilities. Suzuki CEO Osamu Suzuki first brought up the idea to relocate some of its higher risk coastal properties during its 2011-2012 fiscal year forecast report.